B. SANITARY SEWER SPECIFICATIONS OCTOBER 2003 HARVEST-MONROVIA WATER, SEWER, AND FIRE PROTECTION AUTHORITY SECTION 1.00 1.10 Purpose The purpose of this document is to assemble the sewer specifications, policies, SEDIMENT/STORMWATER MANAGEMENT BASIN CONSTRUCTION CHECKLIST For permanent structures per Delaware SCS Pond Code 378 and Delaware Sediment and Stormwater Regulations KEY PROJECT INFORMATION Item meets standard, LS 2540 SEWER LATERALS AND INSPECTION TEES A. Students are required to register for classes on the GCC and/or CCWA web sites. SIENA STONE GRAVITY RETAINING WALL INSTALLATION SPECIFICATIONS. SECTION 9.02 BUILDING SUBSURFACE DRAINS (PERIMETER, ETC. If the soils is 100 percent saturated and the voids are full of water and has a high MC. SECTION 33 41 00 REINFORCED CONCRETE PIPE. Cleaning, Inspecting, and Testing Sanitary Sewers B. The following is a list of SPECIFICATIONS, which may be related to this section: A perforated conduit such as pipe, tubing or tile installed beneath the ground to intercept and convey ground water. Links may open in a new window. Web Policy / Privacy Statement / WAI Compliance / Email Safety / Site Map, APD Instructional and Informational Memoranda, Minimum Requirements for Quality Assurance and Quality Control on Design Build and P3 Projects, AASHTOWare Project Preconstruction (AWP-P) Manual, Construction Instructional and Informational Memoranda, Instructional and Informational Memoranda, Alternative Intersection Informational Design Guides, LD Instructional and Informational Memoranda, PMO Instructional and Informational Memoranda, Pollution Prevention Field Guide for Construction Activities, Roadside Development Report Excel spreadsheet tool, Nutrient Management Plan for Construction Projects, Nutrient Management Plan for Roadside Management, VDOT BMP Maintenance Manual Appendix C - Plant Palette Tables, Materials Certification School Information, Guide to the Traffic Impact Analysis Regulations, Land Development Inspection Documentation Best Practices Manual, OD Instructional and Informational Memoranda, Guide Manual for Causes and Repair of Cracks in Bridge Deck, Traffic Calming Guide for Neighborhood Streets, Manual on Uniform Traffic Control Devices (MUTCD), TED Instructional and Informational Memoranda, VDOT Traffic Operations and Safety Analysis Manual (TOSAM), Instructional and informational memoranda, Manual for the Procurement and Management of Professional Services. Length of run = 275 ft. (Pipe Diameter lift thickness) + (Fill above pipe lift thickness) (1 lift) = 1) (48 in. What term refers to the texture and firmness of a soil? Geotechnical Design Parameters for Retaining Walls, Sound Barrier Walls and Non-Critical Slopes. A trench at the edge of the pavement provides a cavity with the least resistance for water to flow and accommodate pavement drainage. All rights reserved. Structural Fill See Section (A)(2)(g) of the Road and Bridge Specifications for complete requirements for backfill material. Inspect how the pipe is being stored on site to ensure no damage is being done to the pipe prior to installation. Highway Plan Reading Guide. The CCWA is hosting the following courses, which are available in a traditional (instructor-led) format or as a self-study option, allowing the students to challenge the Materials Certification exams: For more information on CCWA courses and registration click hereor contact CCWA at 804-523-2290 or 804-523-2292. VDOT: Soils and Aggregate Compaction - Community College Workforce Alliance 0
The foundation is to be explored below the bottom of the excavation to determine the type and condition of the foundation. There are many types of compaction equipment available. The video camera inspection is to be conducted with a VDOT representative present. 0 vdot soils and aggregate certification If the mandrel test is to be performed to mechanically measure deformations/deflections of the pipe/culvert, the mandrel used shall be a nine (or greater odd number) arm mandrel, and shall be sized and inspected by the Engineer prior to testing. What term describes the distribution of various particle sizes with the material? PDF a/o May 2018 MATERIALS CERTIFICATION SCHOOLS FREQUENTLY ASKED QUESTIONS 12) How long after installation is complete can the video inspection can be done? Senior Transportation Construction Inspector to join us in VDOT's Northern Virginia to inspect all phases of construction on highway construction and maintenance projects.To oversee, monitors . 6.2 PIPE PVC gravity sewer pipe and fittings, SECTION 02400 - STORM DRAIN SYSTEM CONTENTS: Part 1 - General 1 1.01 Work Included 1 1.02 Related Requirements 1 1.03 Reference Standards 1 1.04 Quality Assurance 1 1.05 Measurement And. FOUNDATIONS STEPS TO CONSTRUCTING A MOISTURE-RESISTANT FOUNDATION Build a Better Home Details are critical when constructing a sound building foundation that will withstand water and control dampness. Where applicable, pulleys may be incorporated into the system to change the direction of pull so that inspection personnel need not physically enter the pipe, culvert or manhole. If the inspection is conducted manually, the person performing the inspection may use a standard video camera or a digital camera to document any observed deficiencies. (PDF) Recycled Concrete Aggregated for the use in Roller Compacted SCOPE. 4 in.) All of the MCS Certifications arevalid for five years and must be retaken every five years to maintain the certification. This website includes hyperlinks to sites neither controlled nor sponsored by VDOT or the Commonwealth of Virginia. ALL students must have a valid account on VDOT University. Each layer of Class I and regular backfill material shall be compacted by rolling, tamping with mechanical rammers, or hand tamping with heavy metal tampers with a face of at least 25 square inches. SECTION IV - TESTS AND INSPECTIONS PART 1 - GENERAL 1.01 Testing - General Testing shall be of the type and frequency described in each section and summarized in Item 1 of this section. qc]o^~n_Q%adt|Ha$|y%{DF0*&pu6YoV77Rjk1}O7MEnvGHN5ltvMaCpZVl^hTlkQ0Vd5Lgf]n v.l
PU5,ep
jL4*$:@i'gCo'?(j]IDD1s0NhJ#+H>L[x5IG
++lx.g44FKp[\E{{
4Y~r\=5ntm)U&LO,~?rmua*)[FDyU{|ba ,n-Osl?*O%AAwoi6y(^f6.qtRz m%UieD,s ,`#2%"%z*)T C]}9xiool+5hlG 7x9xq.N?K#!v70o%W"aa#gqm?btkABf1y6kudW\L-NzUvZK4oN^G)D|;&dU_9*k5NR]Nlmu.J NT6lW-a% ItC&1`{z'`kP wh"0h{
Soils and Aggregate Compaction Technician MARTCP. 7) Install the longitudinal perforated pipe at the bottom of the trench without bedding material. . What are those two functions? When backfill is below spring line of pipe, compact next to pipe first and work towards the trench wall. What is the moisture content at which soil can be compacted to its maximum dry density with the least amount of comparative effort called? 0
What is the behavior of a material where the material deforms under load and does not return to its original shape called? Pipe Materials B. 57 stone can be used as a backfill in the sub foundation. Some courses also require that the proficiency be demonstrated at a VDOT approved locations. Computer-based testing (CBT) allows NICET to extend several benefits to our customers: more flexible exam dates and appointment times; immediate scheduling and confirmation; and quicker exam scoring. For positive projection embankment installations, the embankment material should be placed and compacted to a minimum of one foot above the pipe and the trench excavated into the embankment. These underdrains are segmented systems with outlets spaced at 250 to 350 feet. VDOTSoilsandAggregateCompaction 6 FIELDMOISTUREANDDENSITYTESTING WITHTHENUCLEARGAUGE LEARNINGOUTCOMES . Soil Compaction Handbook ff Soil Compaction Soil compaction is defined as the method of mechanically increasing the density of soil. (PDF) Soil Compaction Handbook | Student life - Academia.edu 2016v1.0 Chapter 4 16, 17 PAVEMENT DRAINS Pavement subsurface drainage is essential in obtaining a well performing pavement, whether it is flexible, rigid or composite. When you learn and master soils inspection, your market value shoots up. Deficiencies found may include: but are not limited to, the following: Crushed, collapsed or deformed pipe or joints Alignment defects Improper Joints (allow infiltration of soil) Misaligned joints (allow debris accumulation) Pipe Penetrations (guardrails, utilities, etc.) Students must bring valid ID & attend class in order to test. For assistance printing or verifying your Materials Certifications Report use this click here. SECTION 02612 NONREINFORCED CONCRETE SEWER PIPE, Division 2 Section 32 14 13.19 Section 02795. List benefits of drainage 2. VDOT Soils and Aggregate Compaction: Chapter 1 - Quizlet SECTION 02530 STORM DRAINAGE STRUCTURES. The function of the pipe, the soil type present in the trench, the depth of the pipe can all influence the type of pipe selected. Often, shaped beddings are used to insure proper placement and compaction of materials under the pipe haunch. This program will encompass nuclear density testing, one-point proctor and "Speedy" moisture, construction and testing of embankments and subgrade, pipe installation, roller patterns and reports. Enrollment can be completed on through Germanna Community College or CCWA. SUMP DRAINS 7-3 7.3. VECAT,through Germanna Community College (GCC), is hosting the following courses, which are now available either online or in a face to face format: For more information on courses and registration click here or contact Judith Calvert, 540-937-6757. 200 sieve (75 micrometers). Natural ground slope, PIPE INSPECTION AND REPAIR. Download Free PDF. A standard Video/ Digital Camera can be used. <>/ExtGState<>/ProcSet[/PDF/Text/ImageB/ImageC/ImageI] >>/Annots[ 11 0 R 12 0 R 21 0 R 25 0 R 31 0 R 32 0 R 33 0 R 34 0 R 47 0 R 48 0 R 49 0 R 50 0 R 51 0 R 52 0 R 53 0 R 54 0 R 55 0 R 56 0 R 57 0 R 60 0 R 61 0 R 62 0 R 63 0 R 64 0 R 65 0 R 66 0 R 67 0 R] /MediaBox[ 0 0 612 792] /Contents 4 0 R/Group<>/Tabs/S/StructParents 0>>
If the inspection is conducted by video: The video camera must have fully articulated lenses (360 degree inspection). Find the right form for you and fill it out: VisitingProfessorofLaw,StanfordLawSchool(W No results. stream
Please click on the course title to see the full course description. These items shall conform to Section 31, "Storm Drain Installation," of these Standard Provisions. The cost estimates, SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO) 1 Intent: The intent of trenchless sewer pipe Insertion is to rehabilitate the existing sewer. Install Pipe The grade of the pipe should always be monitored during installation. Request PDF | Advanced fatigue and rutting characterisation of Polish asphalt mixtures based on the VECD model and viscoplastic shift model | The advanced asphalt mixture performance-related . eG%\!9]y7WS{t
m+zVjO!s[tG{y Q3@CJY1 9&. VDOT : Central Mix Aggregate Plant with Proficiency - FULL PRICE NON VIRGINIA RESIDENTS, CCWA - Workforce Development and Conference Center, VDOT SELF-STUDY: Central Mix Aggregate Plant with Proficiency, VDOT SELF-STUDY: Soils and Aggregate Compaction, VDOT: Central Mix Aggregate Plant with Proficiency, VDOT: Documentation and Recordkeeping for Inspectors. SECTION 33 41 03 POLYVINYL CHLORIDE (PVC) PIPE, STANDARD SPECIFICATIONS SECTION 03461 PRECAST REINFORCED CONCRETE MANHOLES AND MANHOLE BASES. Currently VDOT certified or Mid Atlantic Regional Technician Program (MARTCP) in the following disciplines: - Expected VDOT Certifications Soil and Aggregate Field Compaction Asphalt Field Hydraulic Cement Concrete Field Pavement Marking Flagger Certification Certification & Issuing Agency Soil and Aggregate Compaction - VDOT or NICET LEVEL II* STORM SEWERS. 7-1 7.2. %PDF-1.7
SECTION 701 CULVERT PIPE, ENTRANCE PIPE, STORM SEWER PIPE, AND EQUIVALENTS 701.01 DESCRIPTION. 13) Use vibratory plate with a welded foot to compact the aggregate backfill. If you wish to receive this content in an accessible format per Section 508 of the federal Rehabilitation Act, 29 U.S.C. Compaction testing on No. The top few inches should be slightly yielding (loose) and fill the corrugations. Manhole Backfill Frequency Example: Depth of Backfill = 9 feet Depth of Backfill (ft.) 5 ft. = Depth of Backfill below top 5 feet 1) 9 ft. 5 ft. = 4 ft. 2) 4 ft. x 3 lifts/ft. Computation of U.S. Responds to data requests. PDF 6 - Section 4 - Construction and Inspections - Henrico County, Virginia This program will encompass nuclear density testing, one-point proctor and "Speedy" moisture, construction and testing of embankments and subgrade, pipe installation, roller patterns and reports. Work shall consist of furnishing and constructing a Rockwood Classic 8 with PCS unit segmental retaining wall, Appendix C: Pipe Material Policy Page C-1 PIPE MATERIAL POLICY Policy: This policy will replace all previous policies regarding the selection of pipe material for cross drains, drive pipe, drop pipe, storm, SECTION 33 31 00.11 GRAVITY SANITARY SEWERS PART 1: GENERAL 1.01 SCOPE A. 7) What is the maximum height of cover for a 48 inch pipe diameter Class IV concrete pipe culvert? N7R;No7^Y 1-800-UNILOCK www.unilock.com FOREWORD This outline specification has been prepared for, CITY OF PETALUMA STORM DRAIN DESIGN AND CONSTRUCTION STANDARDS & SPECIFICATIONS 400 SERIES AUGUST 1999 Revised 10/98 City of Petaluma Petaluma, California STORM DRAIN INSTALLATION DETAIL, Session 7: Retrofitted Edge Drains 7.1 Learning Outcomes 1. Contractor shall ensure that all permits are obtained prior to any construction. Place sample in container and weigh. %%EOF
(Make a Mark on Outside of Pipe) Moving pipe around after joining may cause pipe joint to work apart. A drained pavement structure has a higher bearing capacity that can effectively support traffic loadings, and lead to long lasting pavement at the least maintenance cost. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS, Storm Sewer Trenchless Upgrade Alternatives and Recommendations, SECTION 32 14 13.19 PERMEABLE INTERLOCKING CONCRETE PAVEMENT (1995 MasterFormat Section 02795). Lime is used with soil to add strength to the mixture, to raise the pH of the mixture, to assist in drying out soils, and to reduce soil plasticity. PDF 02210 - TRENCHING, BACKFILLING AND COMPACTION OF UTILITIES - Lynchburg ITEM NO. These guidelines are applicable to the locating, marking, SECTION 5 - STORM DRAINAGE 5.01 Design Storm drainage facilities shall be designed in accordance with the goals and guidelines set forth in the Unified Development Ordinance. bored but can't be bothered to do anything. 2e\o ngV10J6q`pp)|Hpm3@BF >
endobj
298 0 obj
<>
endobj
299 0 obj
<>stream
MANHOLES 7-4 7.5. 500 grams is the minimum sample required for soils and for aggregate the sample size depends on the Nominal Maximum Size Aggregate. The Work shall consist of furnishing and installing sewer mains, manholes, laterals, cleanout fittings and appurtenances; and testing, flushing and, 715.01 430 volume of concrete occupied by the drain pipe in a cast-in-place structure or structure extension. VDOT Soils and Aggregate Compaction: Chapter 3. endstream
endobj
startxref
All new construction involves a study and analysis of the on-site soils. Concrete Field 1. In a flexible pipe this zone must protect the pipe from distortions due to loading extend to 12 above pipe. VDOT states 75 years for higher functional classification roads and 50 years for lower functional classification roads. suzanna_gevorgyan. AASHTO T99 The Moisture-Density Relations of Soils using a 5.5-pound Rammer and a 12-inch drop. This Section describes the requirements for excavating, filling, and grading for earthwork at Parking Structure, new exit stair and as required to, DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL 1.01 DESCRIPTION A. Furnish and install all storm drains, including manholes, inlets, service lines and other appurtenant. The goal shall be to collect, C PROJECT ESTIMATE ASSUMPTIONS AND EXCLUSIONS In support of the alternatives development process, preliminary cost estimates were prepared for each of the three Candidate Build Alternatives. %%EOF
Some links may require the Adobe Reader. waste aggregate )-4CWP( 4% ceramic waste pow der) represents a 10% aggregate substitution with ceramic waste. Figure 4.3: Minimum Cover to Allow Construction Traffic over Pipe 2016v1.0 Chapter 4 3, 4 The following tables give VDOT specifications for maximum height of cover for some types of pipe. There is a variety of pavement under/edge drains in the VDOT Road and Bridge Standards Volume 1 ( ) with each addressing a specific geometric condition and groundwater condition. See the following table for VDOT recommendations. Generally excavated embankment material is used as the final backfill. Soils will not need to obtain a VDOT Soils and Aggregate Compaction Certification. Screen the sample over a 3/4-inch sieve and replace the aggregate retained with an equal weight of No. Provide concrete sewer pipe less than 12 inches in diameter, and in other sizes, Note: The text must be edited to suit specific project requirements. Municode Library Participated in traffic . 1100 SLIP-LINING SANITARY SEWERS, SEDIMENT/STORMWATER MANAGEMENT BASIN CONSTRUCTION CHECKLIST, LS 2540 SEWER LATERALS AND INSPECTION TEES, CLEANING, INSPECTION, AND TESTING OF SEWERS, SECTION 33 41 13 PUBLIC STORM UTILITY DRAINAGE PIPING, Beacon Hill Sewer District Standard Specifications. In this research work three methods of handling rock sized aggregates which include compacting the whole sample (method . 4 0 obj
VDOT Soils and Aggregate Compaction 2016v1.0 Appendix B | 2 Conditions of Use Type of Inlet Protection, INSTALLATION GUIDE americanwick.com 800.242.WICK (9425) American Wick Drain SITEDRAIN prefabricated drainage products may be installed in a variety of civil construction applications including: retaining. No. The moisture content at which a soil begins to behave like a liquid is called the liquid limit. stiffness 35 psi) is the collecting conduit 4) Aggregate backfill (#8 or #57) 5) Non perforated smooth wall outlet pipe (min. 1. Please check your spelling or try another term. You do not have to place pipe bedding material down first when installing a UD 4. Geotechnical Bulletin PLAN SUBGRADES, SECTION 701 CULVERT PIPE, ENTRANCE PIPE, STORM SEWER PIPE, AND EQUIVALENTS, SECTION 33 05 16.13 PRECAST CONCRETE UTILITY STRUCTURES, Specification Guidelines: Allan Block Modular Retaining Wall Systems, Section 2 Specification 2.18 Concrete and/or Corrugated Steel Storm Sewer TABLE OF CONTENTS, SECTION IV - TESTS AND INSPECTIONS PART 1 - GENERAL. = 12 lifts 3) 12 lifts 1 lift (skip first lift) = 11 lifts 4) 11lifts 4 (test every fourth compacted lift) = 2.75, round up to 3 tests in bottom 4 ft. of backfill Top 5 ft. of backfill x 3 lifts/ft. Exams are offered at various locations in Virginia. A compacted soil has a reduced rate of both water infiltration and drainage. vdot soils and aggregate certification - shopatcrisp.com 10) What is the maximum backfill lift thickness? 3) 104 in. The requirements for pipe material and installation in sewer and drainage collection systems. CON 310 Soils and Aggregates (Soils and Compaction) Homework Name:_____ 1) Why is it important for material testing technicians understand how to perform both the nuclear density test and the sandcone test for compaction testing?